Maintenance Gap Analysis Project – Case Study

To review the quality of information, provide an Audit & Benchmarking opportunity, and determine operational threats & risks through identification of gaps within current system.

 

Client:   Offshore Assets.

Location:   Central Luconia Province, East Coast Malaysia. 

Duration:   15 working days.

Known Issues

  • No Planned Maintenance on Priority 1 items
  • CMMS not updated with completed Projects
  • High level of breakdowns on critical equipment
  • Incomplete information caused planning concerns
  • Longer outages than were planned
Gap-Analysis-Methodology-Table-1

Our Approach

Gap analysis included the use of our AIMS (Asset Integrity Management) software tool that facilitates the quick and practical study of the gathered data, documentation and drawings.

For this particular client, we implemented the Hofincons Gap Analysis Methodology to augment their articulated strategy and deliver an improved and reliable system

Initial Findings

  • CMMS did not reflect P&ID’s, PEFS, Cause & Effects due to ‘new’ projects information submitted to the CMMs department
  • Planned Maintenance Task frequencies needed improvements in-line with current Benchmarking ideas and new technologies
  • Planned Maintenance Tasks were more intrusive – than having on condition tasks implemented
  • Equipment was frequently breaking down but with no history of failure codes to address the root cause
  • Man-hours were inconsistent with similar tasks and not equated to the task history
  • Many Planned Maintenance Tasks did not have Material Listing as a minimum requirement and therefore, no Bill of Material
  • Performance Standard Tasks for Safety-Critical Equipment lacked industry best practice

Next Phase Suggestions to Client (Overview)

  • Interface to be built between Projects and CMMS Department.
    By ensuring a close collaboration between the departments, Project information will be entered into the CMMS ensuring all ‘Maintainable Equipment’ is registered, appropriate maintenance and spares applied, thus ensuring less breakdowns and improved production.
  • CMMS to be updated with up-to-date information from ‘past’ projects, P&ID’s PEFS, Cause & Effects. this will be controlled and QA/QC’d by Hofincons AIMS (Asset Integrity Management System) Tool.
    Information will now be visible to the Technicians at site for up to date information, this will assist them in maintaining the registered equipment to its optimum, thus ensuring less breakdowns and improved production.
  • Review current Planned Maintenance Tasks, apply Best Practice Techniques, Benchmarking Initiatives, plus integrate Condition Monitoring Applications, wherever possible.
    A reduction of over 20% of the Planned Maintenance Annual Budget was identified for implementation, this included updating the task frequencies, unwarranted intrusive tasks that can be replaced by on condition and condition monitoring tasks, and the reduction in Technicians at site.
  • The availability of spare parts was causing production down time that could be improved if the CMMS had a Material Listing and / or BOM attached to the relevant equipment.
    By reviewing the CMMS history, we were able to see where the unavailability of a ‘spare’ was causing unnecessary downtime, once implemented there is a potential saving of around 35% of the operational throughput.
  • Many of the Safety Critical Equipment that was identified had outdated (Generic) Performance Standards.
    It was seen that the Performance Standard Tasks were outdated and not achievable (due to old thoughts and aging equipment that could not achieve their goal, i.e. ESDV closures, etc). To this end, by analysing the specific Asset HSE requirements, we suggested that ‘local’ Performance Standard Task requirements should be applied, thus, Safety was not impacted and the testing of the equipment was completed and assured for that particular Asset.

 REGISTER YOUR INTEREST IN OUR GAP ANALYSIS BENCHMARKING AND IMPROVEMENT SERVICE

By registering your interest, you’ll receive:

  • Full details on our Gap Analysis Benchmarking and Improvement service
  • Ongoing insights and advice around benchmarking and asset performance improvements
  • Steps for getting started

OFFER CONTACT FORM

Headquarters – UAE               Oman              Saudi Arabia                India             Indonesia            Qatar              Malaysia              UK               USA             South Africa

© 2019 Copyright | Hofincons IRCA Global. All rights reserved.